ElecLink Ltd High Speed 1, UK

ElecLink Ltd was set up to establish a high voltage direct current (HVDC) 320 kV link to transfer and trade electricity between the grid systems in the UK and France.

Members of the team acted as the Independent Assessor for the ElecLink Project, to ensure all assurance activities are fully integrated.  The holistic integrated assessment included:

     Technical Assurance for Design and Built;

     Earthing & Bonding (E&B);

     Fire Safety;

     Electromagnetic Compatibility and Interference (EMC/EMI);

     Reliability, Availability and Maintainability (RAM);

     Future Operations and Maintenance (O&M);

     Security and Risk;

     Construction, Design and Management (CDM); and  Safety.

Recent Posts

Investing in sustainable infrastructure

Investing in sustainable infrastructure

In 2015, 190 countries, accounted for more than 98 percent of greenhouse-gas emissions which resulted in adopt...

Shifting from stakeholder engagement to stakeholder trust

Shifting from stakeholder engagement to stake...

In an era of hyper-transparency and political and social disruption, companies are re-evaluating their purpose...

Place infrastructure investment at the heart of economic policy

Place infrastructure investment at the heart ...

Infrastructure agonises from a sequence of market let-downs that hinder the optimum level of investment from b...

Modern Residential Design

Modern Residential Design

The world of design is tilting a bit further toward the modern side of the spectrum these times. The modern-mi...